International Apple Festival
Organised the International Apple Festival in Dehradun, India, from 24–26 September 2021.
A detailed record of programme delivery, international events, horticulture development, farmer services, infrastructure, food processing and institutional progress achieved as Director, Department of Horticulture and Food Processing, Uttarakhand.
| No. | Achievement | Details |
|---|---|---|
| 01 | International Apple Festival | Organised the International Apple Festival in Dehradun, India, from 24–26 September 2021. |
| 02 | International Mushroom Festival | Organised the International Mushroom Festival in Dehradun, India, from 18–20 October 2021. |
| 03 | International Spice Vegetable Conclave | Organised the International Spice Vegetable Conclave in Dehradun, India, from 16–18 November 2021. |
| 04 | International Honey Bee Festival | Organised the International Honey Bee Festival in Dehradun, India, from 18–20 December 2021. |
| 05 | HMNEH proposals and annual action plan | Horticulture Mission for North East and Himalayan States proposals amounting to Rs. 1109.81 lakh were approved or recommended by the State Level Executive Committee. An Annual Action Plan of Rs. 48.89 crore was approved by the Government of India. |
| 06 | Horticulture and beekeeping workforce | Recommendations were made for hiring 115 employees at State and District Level for HMNEH implementation. Proposals of Rs. 1989.20 lakh were recommended under the National Beekeeping & Honey Mission, along with 130 implementation posts. |
| 07 | Annual budget and farmer marketplace action | For financial year 2021–22, budget provisions of Rs. 236.77 crore under State Sector Schemes, Rs. 85.56 crore under Centrally Sponsored Schemes and Rs. 10.00 crore under Externally Aided Schemes were made. Spring Festival 2021 and a Buyer-Seller meet for florists were also organised. |
| 08 | Additional action plan for horticulture | An Additional Action Plan of Rs. 280.00 crore was recommended for holistic horticulture development, covering quality seed and planting material, hi-tech nurseries, tissue culture, mushroom units, plant health, centres of excellence, mechanisation and food processing. |
| 09 | RIDF proposals through NABARD | Under the RIDF scheme, proposals of Rs. 103.69 crore were forwarded to the State and in-principle approval was granted for Rs. 74.01 crore in a meeting chaired by the Chief Secretary, Uttarakhand. |
| 10 | Government garden classification and transfer | Government Gardens were classified in Grade A, B and C for quality planting-material production. Transfer of 32 Government Gardens was completed to line departments for agri-allied activities. |
| 11 | Expanded PMFME implementation team | Effective communication with the Government of India led to in-principle approval for four PMFME posts: State Lead Project Manager, Marketing Manager, Entrepreneur Development Manager and Food Technology Manager. |
| 12 | Micro-irrigation support for farmers | A proposal under NABARD’s Micro Irrigation Fund sought a 25% additional subsidy for drip and sprinkler systems for small and marginal farmers, targeting 70,000 farmers across 55,000 hectares in five years. |
| 13 | Mission Apple standards updated | Standards of the Mission Apple Scheme were amended to promote Double Working (Inter Stock Method), keeping the compatibility of hill areas in view. |
| 14 | Digital delivery and departmental strengthening | Action was taken to prepare a portal for online applications and DBT benefits. Demonstration blocks were planned in State parks, pending service matters were resolved and recruitment requisitions were sent to the relevant commissions. |
| 15 | Budget utilisation across schemes | Against a total budget provision of Rs. 425.20 crore in financial year 2021–22, Rs. 342.60 crore was approved and Rs. 338.06 crore was properly utilised across district, State, centrally funded and externally assisted schemes. |
| 16 | High-quality fruit planting material | Government Gardens produced 13.17 lakh high-quality fruit planting materials during 2021–22. |
| 17 | PMFME units and incubation centres | In 2021–22, 22 units were approved under the PMFME scheme. One incubation centre was established at Pantnagar and two additional centres at Kaladhungi, Nainital and Gangalahari, Dehradun were approved. |
| 18 | PMFME store for farmer branding | A PMFME Store was established at Rajpur Road, Dehradun for branding and marketing farmer produce. Six further locations were identified for similar units. |
| 19 | Horti-tourism sites developed | Government Gardens at Chaubatia in Almora, Ramgarh in Nainital and Dhanaulti in Tehri were developed as ideal sites for horticulture tourism. |
| 20 | Cold storage and pack-house infrastructure | Under NABARD’s RIDF scheme, a 1000 metric tonne apple cold store was set up at Arakot, Uttarkashi, while work was initiated for nine investment centres and nine pack houses. |
| 21 | Climate-smart irrigation system | A proposal of Rs. 10.01 crore was approved under NABARD’s RIDF scheme to conserve soil nutrients, improve water-use efficiency and increase product quality on Government Gardens and farmers’ fields. |
| 22 | Mission Horticulture expansion | Two fruit nurseries were established. Area expansion covered approximately 1157 hectares of fruits, 1346 hectares of vegetables, 700 hectares of spices and 90 hectares of flowers. Rejuvenation covered 80 hectares, while 29,000 square metres of polyhouses were established. |
| 23 | Uttarakhand Fruit Nursery Guidelines | The Uttarakhand Fruit Nursery Rules 2021 were promulgated to make quality planting material available to farmers across Uttarakhand. |
| 24 | Post Entry Quarantine Centre | A Post Entry Quarantine Centre was initiated at the Government Garden in Magra, Tehri, through the National Horticulture Board for importing high-quality apple and walnut planting material. |
| 25 | Special horticulture assistance project | A special financial assistance proposal titled “Harnessing the Horticulture Potential of Uttarakhand”, valued at Rs. 2000.00 crore, was drafted and sent to the Government of India for approval. |
| 26 | JICA horticulture development project | Rs. 526.00 crore was approved under an externally funded JICA project for holistic horticulture development in Tehri, Uttarkashi, Nainital and Pithoragarh. |
| 27 | Walnut production proposal | A project proposal of Rs. 400.00 crore was sent to the Department of Agriculture Cooperation and Farmers Welfare for developing walnut production in Uttarakhand. |
| 28 | Polyhouse and shade-net proposal | A project proposal of Rs. 58.00 crore was sent to the Government of India for establishment of polyhouses and shade-net houses under conservation agriculture. |
| 29 | Four-festival international programme | Four international festivals were successfully conducted: Apple, Mushroom, Spices/Vegetable and Bee festivals. Farmers, scientists, research institutes, universities and international and national participants shared knowledge on production, processing, packaging, marketing and export. |
| 30 | Tea development budget utilisation | During financial year 2021–22, 100% utilisation was achieved against the total budget provision and approved amount of Rs. 21.08 crore for tea development. |
| 31 | Tea tourism expansion | The garden at Nainital was developed to promote tea tourism, with further development planned in Champawat and Kausani. |
| 32 | Micro-irrigation for tea gardens | Under NABARD’s Micro Irrigation Fund scheme, Rs. 1563.00 lakh was developed for drip and sprinkler irrigation across 919 hectares of tea gardens, with implementation initiated after Government of India approval. |
Organised the International Apple Festival in Dehradun, India, from 24–26 September 2021.
Organised the International Mushroom Festival in Dehradun, India, from 18–20 October 2021.
Organised the International Spice Vegetable Conclave in Dehradun, India, from 16–18 November 2021.
Organised the International Honey Bee Festival in Dehradun, India, from 18–20 December 2021.
Horticulture Mission for North East and Himalayan States proposals amounting to Rs. 1109.81 lakh were approved or recommended by the State Level Executive Committee. An Annual Action Plan of Rs. 48.89 crore was approved by the Government of India.
Recommendations were made for hiring 115 employees at State and District Level for HMNEH implementation. Proposals of Rs. 1989.20 lakh were recommended under the National Beekeeping & Honey Mission, along with 130 implementation posts.
For financial year 2021–22, budget provisions of Rs. 236.77 crore under State Sector Schemes, Rs. 85.56 crore under Centrally Sponsored Schemes and Rs. 10.00 crore under Externally Aided Schemes were made. Spring Festival 2021 and a Buyer-Seller meet for florists were also organised.
An Additional Action Plan of Rs. 280.00 crore was recommended for holistic horticulture development, covering quality seed and planting material, hi-tech nurseries, tissue culture, mushroom units, plant health, centres of excellence, mechanisation and food processing.
Under the RIDF scheme, proposals of Rs. 103.69 crore were forwarded to the State and in-principle approval was granted for Rs. 74.01 crore in a meeting chaired by the Chief Secretary, Uttarakhand.
Government Gardens were classified in Grade A, B and C for quality planting-material production. Transfer of 32 Government Gardens was completed to line departments for agri-allied activities.
Effective communication with the Government of India led to in-principle approval for four PMFME posts: State Lead Project Manager, Marketing Manager, Entrepreneur Development Manager and Food Technology Manager.
A proposal under NABARD’s Micro Irrigation Fund sought a 25% additional subsidy for drip and sprinkler systems for small and marginal farmers, targeting 70,000 farmers across 55,000 hectares in five years.
Standards of the Mission Apple Scheme were amended to promote Double Working (Inter Stock Method), keeping the compatibility of hill areas in view.
Action was taken to prepare a portal for online applications and DBT benefits. Demonstration blocks were planned in State parks, pending service matters were resolved and recruitment requisitions were sent to the relevant commissions.
Against a total budget provision of Rs. 425.20 crore in financial year 2021–22, Rs. 342.60 crore was approved and Rs. 338.06 crore was properly utilised across district, State, centrally funded and externally assisted schemes.
Government Gardens produced 13.17 lakh high-quality fruit planting materials during 2021–22.
In 2021–22, 22 units were approved under the PMFME scheme. One incubation centre was established at Pantnagar and two additional centres at Kaladhungi, Nainital and Gangalahari, Dehradun were approved.
A PMFME Store was established at Rajpur Road, Dehradun for branding and marketing farmer produce. Six further locations were identified for similar units.
Government Gardens at Chaubatia in Almora, Ramgarh in Nainital and Dhanaulti in Tehri were developed as ideal sites for horticulture tourism.
Under NABARD’s RIDF scheme, a 1000 metric tonne apple cold store was set up at Arakot, Uttarkashi, while work was initiated for nine investment centres and nine pack houses.
A proposal of Rs. 10.01 crore was approved under NABARD’s RIDF scheme to conserve soil nutrients, improve water-use efficiency and increase product quality on Government Gardens and farmers’ fields.
Two fruit nurseries were established. Area expansion covered approximately 1157 hectares of fruits, 1346 hectares of vegetables, 700 hectares of spices and 90 hectares of flowers. Rejuvenation covered 80 hectares, while 29,000 square metres of polyhouses were established.
The Uttarakhand Fruit Nursery Rules 2021 were promulgated to make quality planting material available to farmers across Uttarakhand.
A Post Entry Quarantine Centre was initiated at the Government Garden in Magra, Tehri, through the National Horticulture Board for importing high-quality apple and walnut planting material.
A special financial assistance proposal titled “Harnessing the Horticulture Potential of Uttarakhand”, valued at Rs. 2000.00 crore, was drafted and sent to the Government of India for approval.
Rs. 526.00 crore was approved under an externally funded JICA project for holistic horticulture development in Tehri, Uttarkashi, Nainital and Pithoragarh.
A project proposal of Rs. 400.00 crore was sent to the Department of Agriculture Cooperation and Farmers Welfare for developing walnut production in Uttarakhand.
A project proposal of Rs. 58.00 crore was sent to the Government of India for establishment of polyhouses and shade-net houses under conservation agriculture.
Four international festivals were successfully conducted: Apple, Mushroom, Spices/Vegetable and Bee festivals. Farmers, scientists, research institutes, universities and international and national participants shared knowledge on production, processing, packaging, marketing and export.
During financial year 2021–22, 100% utilisation was achieved against the total budget provision and approved amount of Rs. 21.08 crore for tea development.
The garden at Nainital was developed to promote tea tourism, with further development planned in Champawat and Kausani.
Under NABARD’s Micro Irrigation Fund scheme, Rs. 1563.00 lakh was developed for drip and sprinkler irrigation across 919 hectares of tea gardens, with implementation initiated after Government of India approval.
| No. | Major project | Project details |
|---|---|---|
| 01 | Centre of Excellence for Berries cum Integrated Horticulture Training Centre with Promotion of Beekeeping | Project cost: Rs. 1895.25 lakhs. |
| 02 | High Tech Nursery Centre — strengthening of Government Gardens | Project cost: Rs. 5117.39 lakhs. |
| 03 | Community Food Processing and Training Centres and Government Food Science and Training Centre infrastructure | Project cost: Rs. 1120.00 lakhs. |
| 04 | Integrated Irrigation Facility and Mechanization in Government Gardens | Project cost: Rs. 1824.48 lakhs. |
| 05 | Establishment of Botanical Garden, Dehradun | Project cost: Rs. 455 lakhs. |
| 06 | Horti-tourism project work in Government Garden, Gangalehri, Rishikesh, Raiwala | Project cost: Rs. 1245.38 lakhs. |
| 07 | Harnessing the Horticulture Potential of Uttarakhand | Project cost: Rs. 2000 crore. |
| 08 | Uttarakhand Madhu Mission | Proposal submitted. Project cost: Rs. 299 crore. |
| 09 | Harnessing the Apiculture Potential of Uttarakhand under a special package | Proposal submitted. Project cost: Rs. 22,515.75 lakhs. |
| 10 | Tea Processing, Research and Packaging Unit and Rural Tea Tourism, Champawat | Project cost: Rs. 1899 lakhs. |
| 11 | Integrated Horticulture Training Centre and Promotion of Beekeeping, Champawat | Project cost: Rs. 1895.25 lakhs. |
| 12 | Micro-irrigation and irrigation in Nainital, Almora, Champawat, Bageshwar, Pithoragarh, Chamoli, Rudraprayag and Pauri | Project cost: Rs. 1824.49 lakhs. |
| 13 | Community Food Processing and Training Centres and Government Food Science and Training Centre infrastructure | Project cost: Rs. 1120 lakhs. |
| 14 | High Tech Nursery Centre — strengthening of Government Gardens | Project cost: Rs. 5117.39 lakhs. |
| 15 | JICA Project | Project cost: Rs. 526 crore. |
| 16 | Honey and bee-hive products processing, testing, trading, branding and marketing unit at Jeolikote, Uttarakhand | Project cost: Rs. 468.5 lakhs. |
| 17 | Integrated irrigation facility, mechanization and infrastructure development in Government Gardens | Project cost: Rs. 1238.68 crore. |
| 18 | HMNEH Additional Annual Action Plan 2023–24, Uttarakhand | Project cost: Rs. 4500.611 lakhs. |
| 19 | MIDH Component | Project cost: Rs. 4444.44 lakhs. |
| 20 | Irrigation Component | Project cost: Rs. 22.04 crore. |
| 21 | Climate Smart Irrigation System under NABARD-RIDF Scheme | Project cost: Rs. 1.2928080 crore. |
| 22 | Centre of Excellence for Potato and Vegetable and Tissue Culture Laboratory at Government Garden, Dwari, Uttarkashi | Proposal submitted. Project cost: Rs. 1291 lakh. |
| 23 | Centre of Excellence for Floriculture in Nainital district | Proposal submitted. Project cost: Rs. 1000 lakh. |
| 24 | Indo-Dutch Centre of Excellence on Temperate Fruits, Uttarakhand | Proposal submitted. Project cost: Rs. 3.74 crore. |
| 25 | DyLVj vk/kkfjr ikWyhgkml eas lCth ,oa Qwyksa dh [ksrh gsrq izLrko | Proposal submitted. Project cost: Rs. 304.43 crore. |
| 26 | Integrated development of walnut in Uttarakhand as a special package | Proposal submitted. Project cost: Rs. 400 crore. |
| 27 | Special Package Action Plan under HMNEH | Project cost: Rs. 1200 crore. |
| 28 | Special Package | Project cost: Rs. 1690 crore. |
Project cost: Rs. 1895.25 lakhs.
Project cost: Rs. 5117.39 lakhs.
Project cost: Rs. 1120.00 lakhs.
Project cost: Rs. 1824.48 lakhs.
Project cost: Rs. 455 lakhs.
Project cost: Rs. 1245.38 lakhs.
Project cost: Rs. 2000 crore.
Proposal submitted. Project cost: Rs. 299 crore.
Proposal submitted. Project cost: Rs. 22,515.75 lakhs.
Project cost: Rs. 1899 lakhs.
Project cost: Rs. 1895.25 lakhs.
Project cost: Rs. 1824.49 lakhs.
Project cost: Rs. 1120 lakhs.
Project cost: Rs. 5117.39 lakhs.
Project cost: Rs. 526 crore.
Project cost: Rs. 468.5 lakhs.
Project cost: Rs. 1238.68 crore.
Project cost: Rs. 4500.611 lakhs.
Project cost: Rs. 4444.44 lakhs.
Project cost: Rs. 22.04 crore.
Project cost: Rs. 1.2928080 crore.
Proposal submitted. Project cost: Rs. 1291 lakh.
Proposal submitted. Project cost: Rs. 1000 lakh.
Proposal submitted. Project cost: Rs. 3.74 crore.
Proposal submitted. Project cost: Rs. 304.43 crore.
Proposal submitted. Project cost: Rs. 400 crore.
Project cost: Rs. 1200 crore.
Project cost: Rs. 1690 crore.
| No. | Market yard | Project details |
|---|---|---|
| 01 | Fruit and vegetable market yard at Parala, Theog, Shimla | Total budget outlay: Rs. 1276.30 lakhs. Inaugurated by the Hon’ble Chief Minister of Himachal Pradesh on 25.05.2015. |
| 02 | Principal / Terminal Market Yard at Parwanoo, Solan | Total fiscal outlay: Rs. 549.00 lakhs. |
| 03 | Market Yard, Palampur Phase-II, Kangra | Budget outlay: Rs. 161.00 lakhs. Inaugurated on 16.02.2015. |
| 04 | Market Yard at Chauribihal, Kullu | Total budget outlay: Rs. 278.34 lakhs. |
| 05 | Sub Market Yard at Mahunala, Chhota Bhangal, Kangra | Total budget provision: Rs. 40.00 lakhs. |
| 06 | Sub Market Yard at Nirmand, Kullu | Total expenditure: Rs. 225.00 lakhs. Inaugurated on 26.11.2014. |
| 07 | Grain Market in Kangra District | Market development valued at Rs. 4.5 crores. |
Total budget outlay: Rs. 1276.30 lakhs. Inaugurated by the Hon’ble Chief Minister of Himachal Pradesh on 25.05.2015.
Total fiscal outlay: Rs. 549.00 lakhs.
Budget outlay: Rs. 161.00 lakhs. Inaugurated on 16.02.2015.
Total budget outlay: Rs. 278.34 lakhs.
Total budget provision: Rs. 40.00 lakhs.
Total expenditure: Rs. 225.00 lakhs. Inaugurated on 26.11.2014.
Market development valued at Rs. 4.5 crores.
| No. | Collection centre | Project details |
|---|---|---|
| 01 | Fruit and Vegetable Collection Centre at Harabagh, Mandi | Developed during 2015–16. |
| 02 | Fruit and Vegetable Collection Centre at Kiri, Chamba | Developed during 2015–16. |
| 03 | Fruit and Vegetable Collection Centre at Sei, Chamba | Developed during 2015–16. |
Developed during 2015–16.
Developed during 2015–16.
Developed during 2015–16.
| No. | Proposal | Project details |
|---|---|---|
| 01 | Sub Market Yard at Mehandli, Rohru, Shimla | Under APMC Shimla and Kinnaur. Fiscal provision: Rs. 30.00 crores. Foundation stone laid on 13.10.2015. |
| 02 | Expansion of Market Yard at Paonta Sahib, Sirmaur | Budget outlay: Rs. 8.00 crores. |
| 03 | Sub Market Yard at Passu, Dharamsala, Kangra | Total expenditure: Rs. 2.00 crores. Foundation stone laid on 22.06.2015. |
| 04 | Expansion of Sub Market Yard at Bhattakuffar, Shimla | Under APMC Shimla and Kinnaur. Budget outlay: Rs. 10.00 crores. Foundation stone laid on 21.05.2015. |
| 05 | Expansion of Market Yard at Dhalli, Shimla | Under APMC Shimla and Kinnaur. Budget provision: Rs. 2.00 crores. |
| 06 | Sub Market Yard at Totu, Shimla | Under APMC Shimla and Kinnaur. Budget provision: Rs. 2.00 crores. Foundation stone laid on 29.08.2014. |
| 07 | Sub Market Yard at Antrawali, Chopal, Shimla | Under APMC Shimla and Kinnaur. Budget provision: Rs. 5.00 crores. |
Under APMC Shimla and Kinnaur. Fiscal provision: Rs. 30.00 crores. Foundation stone laid on 13.10.2015.
Budget outlay: Rs. 8.00 crores.
Total expenditure: Rs. 2.00 crores. Foundation stone laid on 22.06.2015.
Under APMC Shimla and Kinnaur. Budget outlay: Rs. 10.00 crores. Foundation stone laid on 21.05.2015.
Under APMC Shimla and Kinnaur. Budget provision: Rs. 2.00 crores.
Under APMC Shimla and Kinnaur. Budget provision: Rs. 2.00 crores. Foundation stone laid on 29.08.2014.
Under APMC Shimla and Kinnaur. Budget provision: Rs. 5.00 crores.